Studio Frame Lift

The most satisfying part of any build? The time when all the hard work, setting out, preparation and precise making comes together in a heroic couple of days. At a stroke, the form of the building becomes visible. This one is particularly satisfying for me – it’s made on site, from timber grown and milled on site, – with no treatment, processing or transport.

Above: First frame being lifted into place.

Above: First frame up, with second on ground and ready to lift.

Above: Two frames up, Third Frame assembled on the ground and ready to lift.

Three Up.

Above: 4th frame going up.

Above: Truing frames with a plumb bob fashioned from a hammer and a piece of string.

Above: Four frames up. Now ready for secondary structure.

With Alan Matthews, Christopher Matthews, Bernard Twist.

Categories Studio Build Tags

Leave a Comment

Your email is never published nor shared. Required fields are marked *

*
*
*

You may use these HTML tags and attributes:
<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>