Been snagging this afternoon here – 3/4 handed over, and contractor leaving site next week
Final piece of the jigsaw – the curved stair – going in to Stillpoint just before the client moved in today.
Viewed from east side of river, looking at the houses – stillpoint clinic and dojo concealed behind. Decks etc yet to be constructed between the houses. The cantilevered copper pods are designed to bounce light into the buildings and to allow you to stand over the river with a view down it (to left of picture)